久久久久99精品成人片试看|插B内射18免费视频|人人妻人人澡人人爽人人精品免费|囯产精品高清三级一区二区三区
  CompanyNews  
 
→Now Site: Home -> CompanyNews

100m3 cryogenic storage tanks successfully put into operation
新聞來源:    點擊數(shù):2940    更新時間:2016-6-13 15:38:52    收藏此頁

In May, Triumph won the bid of Danyang Longjiang project, which requires following equipment: 1 set of 100m3 LIN cryogenic tank with 18,000Nm3/h vaporizers ;1 set of 100m3 LOX cryogenic tank with 12,000Nm3/h vaporizers; 4 sets of large flow capacity cryogenic pump, PLG electric control system and all the installation. It only took 25 days from the start of manufacture to the end of installation in the whole project,. Now all the equipment has been successfully in operation for a month, operating condition are good and steady.

It proves that it is absolutely right for Triumph to start the cryogenic industry chain. With the devotion of our professional and efficient technical, manufacture, inspection, installation, commission teams, we are able to perform in accordance with the most advanced process standards in China.

This project is another 100m3 cryogenic storage tank included EPC project after “Jiangxi xinyu Steel Group”, “Yunnan Metallurgical Group” , “Xinjiang Jinyuan New Energy Co. ” projects . Another solid prove of how excellent Triumph is at integrated manufacturing and EPC projects. High cost efficient “made by Triumph” is more and more being recognized.




總頁數(shù):1  第  1    頁 

上一篇:Triumph welcomes   下一篇:Triumph won the bid of LNG gasification station of Yunnan Metallurgical Group.
【刷新頁面】【加入收藏】【打印此文】返回

Contact Us
Tel:0510-85583001  
E-mail: sales@triumph-china.com
Address:No.33 Hongxiang Road,Wuxi Economic Development Zone(Hudai Town),Jiangsu,China.
Copyright©Wuxi Triumph Gases Equipment Co.,Ltd.  | Sitall.net Support網(wǎng)站管理
久久久久99精品成人片试看|插B内射18免费视频|人人妻人人澡人人爽人人精品免费|囯产精品高清三级一区二区三区